Vancouver, WA · Portland, OR
Free Estimate
We measure, bring tile and layout ideas, and your written price arrives the same day.
Built from scratch, built to last
Buddy Baths custom bathrooms are hand-built: tile showers on flood-tested RedGard waterproofing, heated floors, large-format porcelain and natural stone, vanities and fixtures, start to finish by one crew.
Your designer measures, brings tile and layout ideas to your home, and your written price lands the same day. Most tile showers take one to two weeks, full remodels two to four.

What we build
Custom means custom: any tile, any layout, heated floors, and a crew that finishes what it starts. One written price before demo.

The shower is the hardest room in the house to get right, and the most expensive to get wrong.
Explore custom tile showers →
A full remodel is every surface and fixture in the room, done in the right order by one crew.
Explore full bathroom remodels →
Bathroom tile lives in the wettest room in the house.
Explore bathroom floor & wall tile →
In the Northwest, a heated bathroom floor is the upgrade people say they'd do again first.
Explore heated tile floors →
Tile and grout are not waterproof.
Explore shower waterproofing →How it works
From your first call to the final walkthrough, you always know what happens next and who's doing it.
Two minutes online or one phone call. Tell us about the shower or tub you have and the one you want.
We measure your space, bring the color, pattern, and glass samples to your bathroom, and your written price lands in your inbox the same day.
Approve online in one tap. Your system is built to your measurements, and our certified crew removes the old shower and installs the new one, most projects in a single day.
You run the water and swing the door before you sign off. Our workmanship warranty, plus any manufacturer warranty on your materials, is in your name.
The Buddy standard
No disappearing contractors. No mystery schedules. No wondering what's next.
Floor protection from the front door to the bathroom, dust contained to one room, and the old shower gone when we leave. One bathroom, one day, and the rest of the house untouched.
A written scope and install date before we take a deposit, a text the morning we arrive, and a walkthrough before we go. No chasing your contractor for updates. Ever.
One written price for the whole shower, base, walls, glass, and labor, before we start. It doesn't move unless you change the plan. No surprise invoices, no games.
You run the water, swing the door, and sign off before the invoice comes. Then our workmanship warranty, plus any manufacturer warranty on your materials, is in your name.
Reviews
We treat every home like it's ours. Here's what that looks like from the homeowner's side.
“They pulled our old tub at 8 in the morning and I took a shower in the new one that night. No grout, no mess, and the glass door is gorgeous.”
“The written price was the price. They put down floor protection to the front door and the house was spotless when they left.”
“My mom can finally step into the shower without help. The seat and grab bars look like they belong there, not like a hospital.”
FAQ
Most full tile showers run $7,000-$10,500 for labor and waterproofing, depending on size and features like niches, benches, or curbless entries. Finish tile is priced with your selections, and your written in-home estimate is free.
Most showers run 5-8 working days from demo to grout: tear-out, waterproofing with a flood test, tile, then grout and seal. If you need it faster and like a seamless look, ask about our one-day shower systems.
RedGard. Every shower gets a full liquid membrane over cement board, a flood-tested pan, and photos of the waterproofing before tile covers it.
Yes. We remove the tub, rebuild the wet area with proper waterproofing, and tile a walk-in or curbless shower, usually within a week or two.
Full remodels are priced from a written scope, because tile, vanity, fixtures, and any plumbing or wall changes drive the number. Your free in-home design visit produces that scope and price the same day, and it does not change unless you change the plan.
Most hall and primary bath remodels run two to four weeks from demo to final walkthrough. You get a written schedule before we start and daily photos while we work.
Adding electric radiant heat to a bathroom floor we are already tiling typically runs about $950-$1,400 including the thermostat, depending on room size.
Free in-home design visit
Two minutes now, an in-home visit this week with samples in hand, and your written price the same day. No pressure, ever.
Free In-Home Estimate
We measure your space, bring the samples, and your written price arrives the same day.